Reference cases and projects

HAUT CHELIFF AND MOYEN CHELIFF IRRIGATION PROJECT

CUSTOMER: ONID (OFFICE NATIONAL DE L'IRRIGATION ET DU DRAINAGE)
LOCATION: UPPER AND MID CHELIFF PLAINS, ALGERIA
Missions:
Installation of 7 electro-pump units on the Haut Cheliff plain, with a total flow rate of 4200 l/s and 4 electro-pump units on the Moyen Chaliff plain, with a total flow rate of 1350 l/s, and total head of 120 m. Reconditioning of 4 existing KSB 5.5 kV electro-pump units (replacement of bearings, flanged guides, sealing rings, connector sleeves, ball bearings, O-rings, etc).
The F&M solution:

The list of successful rehabilitation projects carried out by FELJAS & MASSON is long. The company's track record in the industry, the technical resources of its Design and Engineering Office - in particular its use of the 3D scanner - make FELJAS & MASSON a prominent expert in this area.

Key data:

Algeria is currently setting up many irrigation projects to assure the country's food self-sufficiency. Feljas & Masson participated in one such project to rehabilitate the pumping systems required to irrigate the Haut Cheliff and Moyen Cheliff (upper and mid) sector.



Website created by Studio Version 2 - Legal notices - Site plan - Copyright © Feljas & Masson - All rights reserved