UPGRADING OF THE DRINKING WATER PRODUCTION PLANT IN LANNUCHEN

CUSTOMER: MUNCIPALITY OF LESNEVEN
LOCATION: LANNUCHEN (Department of FINISTÈRE)
Missions:
  • Metering devices for 3 different intake structures supplying the plant
  • Feed water supply of an existing reservoir of 350 m³
  • Pumping station for raw water
  • Raw water pumps: 2 pumps with a rate of 75 m³/h
  • Install the CIFEC's Aquaneutra unit for degassing excess CO2
  • Install a 10 m³ tank for degassed water
  • 2 pumps of 75 m³/h to pump the degassed water
  • A granulated activated carbon filtration system: 2 enclosed stainless steel filters
  • A limestone filtration system: 2 enclosed stainless steel filters
  • Treated water tank of 75 m³
  • Chlorine and soda regulator in the treated water tank
  • Return of treated water to the existing water tower by means of 2 recirculating pumps with a throughput of 75 m³/h
  • Washing water tank : 2 pumps with a flow rate of 215 m³/h
  • Cleaning air installation: 1 compressor of 540 Nm³/h
  • Settling basin of 100 m³
  • All associated electrical, automation, monitoring, supervision equipment and anti-intrusion system
The F&M solution:

Water purification processes are designed in accordance with the physico-chemical properties of the raw water to be treated, but the process selected must also accommodate any operating constraints the facilities present. With a wealth of experience in this field, FELJAS & MASSON Brittany can offer the solutions best adapted to customers' needs.

Key data:
  • Drinking water production plant in Lannuchen (75 m³/h)