Reference cases and projects

RECONSTRUCTION OF THE LAC DE MAINE BOOSTER STATION

CUSTOMER: ANGERS LOIRE METROPOLITAN AUTHORITY
LOCATION: LAC DE MAINE (Department of MAINE ET LOIRE)
Missions:
  • 2 agitators to prevent the sedimentation of suspended solids
  • 1 deodorization system for the pumping tank and the network
  • All appurtenant electrical and automatic control equipment and instrumentation
  • Metalwork and handling equipment
The F&M solution:

The lift or booster stations pump wastewater to the treatment plant where it is treated. The design of the stations is based on the particular requirements of the sanitation network and the treatment process. At FELJAS & MASSON, the Design and Engineering Office studies the customers' constraints and requirements to engineer the most effective equipment for their needs.

Key data:
  • 4 electro-pump units pump the effluent to the neighboring treatment plant - Flow rate: 730 m³/h - Htdyn 19.5 - Motor power: 55 kW


Website created by Studio Version 2 - Legal notices - Site plan - Copyright © Feljas & Masson - All rights reserved