INCREASE BOOSTER CAPACITY OF THE MONTSOURIS PLANT

CUSTOMER: EAU DE PARIS (Paris public water authority)
LOCATION: MONTSOURIS PLANT, PARIS
Missions:
  • Supply and install 2 pump blocks with guaranteed throughput at the following points:
    • 1,500 m³/h per unit at 40 m
    • 2,160 m³/h per unit at 18.7 m
  • The associated hydraulic pipelines
  • Dismantle the existing obsolete hydraulic equipment
  • Provide all metallic hardware, ventilation and handling equipment required
The F&M solution:

The design basis for a drinking water supply network requires in-depth hydraulic analysis. At FELJAS & MASSON, the Design and Engineering Office has this capability and can engineer the optimum equipment for each project's needs and operating constraints.

Key data:
  • 1500 m3/h per unit at 40 m
  • 2160 m³/h per unit at 18.7 m