Reference cases and projects

TREATMENT OF IRON-LADEN WELL WATER

CUSTOMER: SIDERM
LOCATION: LOCATION:
Missions:
  • 3 borewells equipped with a pump delivering 150 m³/h
  • 3 sand filters, each 3.4 m in diameter
  • A chlorine disinfection system
  • 1 caustic soda injection system for pH control
  • CO2 stripping by forced-ventilation cascade column
  • 2 storage tanks
  • 3 treated water distribution pumps (150 m³/pump)
  • 1 surge control unit
  • Electricity, automation and supervision
  • Revamping of electrical control panels of the 3 other plants (ensuring no down-time in service)
The F&M solution:

Water purification processes are designed in accordance with the physico-chemical properties of the raw water to be treated, but the process selected must also accommodate any operating constraints the facilities present. With a wealth of experience in this field, FELJAS & MASSON Brittany can offer the solutions best adapted to customers' needs.

Key data:
  • Production capacity: 9,000 m³/day