Missions:
  • Install an extended low load aeration-type treatment system with nitrification-denitrification and physico-chemical treatment to remove phosphorus
  • Install a macrophyte sludge treatment system (8 reed beds of 154 m²)
  • Install a screw screen, grease and gravel removers
  • Install an aeration tank for variable level operation with 3 floating turbine aerators
  • Install a circular scraper clarifier
  • Industrial water facility (supplying water to pre-treatment spray bars)
The F&M solution:

FELJAS & MASSON equips numerous wastewater plants, of various sizes, thanks to the expertise of its FELJAS & MASSON Brittany branch, specialists in resolving water treatment issues.

Key data:
  • BOD5/day: 296 kg
  • 1,851 m³/day during rainy weather
  • CAPACITY 4,940 p.e.