Reference cases and projects

RAW WATER SUPPLY FOR THE ÉVREUX DRINKING WATER TREATMENT PLANT / BOREWELLS AND PIPELINES / CONSTRUCTION AND EQUIPMENT OF THE OPERATING FACILITIES OF 12 NEW BOREWELLS

CUSTOMER: ÉVREUX URBAN DISTRICT
LOCATION: ÉVREUX (Department of EURE)
Missions:
  • Equip the drinking water borewells with hydraulic and electrical equipment
  • Install the hydromechanical equipment for 12 borewells supplying the Chenapville drinking water plant
  • Construct 12 concrete deep hole boring heads
  • Build the electrical and remote management equipment
  • Build the hydromechanical control system
The F&M solution:

Borewell equipment requires in-depth hydro-geological assessment, and analysis of the physico-chemical properties of the groundwater. At FELJAS & MASSON, the Design and Engineering Office determines the equipment that accommodates these constraints and satisfies the correct operating requirements of the borewells.



Website created by Studio Version 2 - Legal notices - Site plan - Copyright © Feljas & Masson - All rights reserved