Reference cases and projects

REHABILITATION OF 3 PUMPING STATIONS

CUSTOMER: LA FLECHE CITY HALL
LOCATION: Department of SARTHE
Missions:

On the general booster pumping station:

  • Install a second pipeline to assure water supply;
  • Replace the surge control tank
  • Optional: repair of the low-flow rate pump's suction line

On the Fougéré station:

  • Nearly total rehabilitation of the booster pumping station, i.e. the pump blocks and the electrical and hydraulic equipment

On the Loir river plant:

  • Install a flowmeter on the raw water discharge pipe
  • Replace the plant's gate valves and valve mechanisms
The F&M solution:

The design basis for a drinking water supply network requires in-depth hydraulic analysis. At FELJAS & MASSON, the Design and Engineering Office has this capability and can engineer the optimum equipment for each project's needs and operating constraints.



Website created by Studio Version 2 - Legal notices - Site plan - Copyright © Feljas & Masson - All rights reserved