RENOVATION OF THE MASSY PALAISEAU PUMPING STATION

CUSTOMER: Greater Paris Water Authority (SEDIF)
LOCATION: MASSY PALAISEAU (Department of ESSONE)
Missions:
  • Replace the 2 shearing valves UV5 and UV6 on the suction and discharge lines respectively;
  • Replace the recirculating pipe by ND 300 mm;
  • Replace the 3 electro-pump units with unit capacitance of 600 m³/h - 55 m;
  • Replace the pipes and fittings of the surge control tank of 6 m³;
  • Upgrade the station's overall flow metering system by replacing the meters on the 2 discharge pipes with electromagnetic flowmeters, installing a flowmeter on the recirculating pipe and on the MASGE136 pressure relief valve ;
  • Replace 2 non-regulation chlorination systems;
  • Replace the bypass bar and install a safety valve on the tank of 7.1 m³;
  • Replace the MASGE136 pressure relief valve;
  • Install 2 surge control tanks to protect the "Boucle Seine".
The F&M solution:

The design basis for a drinking water supply network requires in-depth hydraulic analysis. At FELJAS & MASSON, the Design and Engineering Office has this capability and can engineer the optimum equipment for each project's needs and operating constraints.

Key data:

Rehabilitation of an existing station, taking space restrictions and compatibility with existing equipment into account.